Cultural cooperation programme PKP
In order to promote cultural
cooperation the Embassy has some funds available to support cultural
exchange activities between the Netherlands and Norway.
More extended cultural cooperation
between institutions or artists from Norway and their counterparts
in the Netherlands is also realized with support from the following
Dutch institutes and foundations which administer funding in their
specific sphere of art:
-
-
-
-
-
-
various cultural activities:
SICA
Funding criteria
A project proposal for financing
under the cultural cooperation programme should correspond to the
following criteria:
-
the project must contribute to
strengthening the cultural cooperation between the Netherlands and
Norway
-
the project must be accessible for
the Norwegian public
-
the project must be of sufficient
quality by both local and Dutch cultural standards
-
the initiative and application
must - in general - come from a local organization which will be
responsible for implementation of the project
-
the project must be non-profit
Applicants are advised to contact Mrs Martha
Bronder before filling out the PKP application form.
Applications
Applications should be sent to:
Embassy of the Kingdom of the Netherlands
attn. Mrs. Martha Bronder
0244 OSLO
You can use the standard
application form which can be downloaded
here. Applications and
related correspondence should be in English. Applications should be
submitted in good time and at least eight weeks before the event.
Assesment and
payment
Applications are assessed as soon as possible. In case of a positive
assessment, the Embassy prepares a grant decision, which is sent to
the applicant. An installment of the financial contribution (usually
100%) will be transferred to the applicant’s bank account within
four weeks after the signing of the grant decision.
The Embassy's contribution is a one-off payment, meaning that no
additional funding can be provided.
Follow-up
In most cases, one final report (covering content and financial
aspects) is expected from the applicant for the whole project period
and the total budget of the project. The report must reflect the
content and expected follow-up of the project. For all the expenses
made within the project, corresponding payment copies must be
presented.